The Project.
In my section the project isn't revealed yet but we are studying the ground were our proyect is supposed to be. We start in october so we have like two months to do the project since the delivery is the 6 of december.
My terrain is close to Parque los Reyes, in a Petrobras. Nearly there is the river Mapocho, and many frreeways. The neighborhood is a little dangerous, is a place that is always so calm but a suspicious quiet environment. The police is always there, and the houses are very small, it's an old neighborhood, so the facade is in the side walk and have no yard.
The thing that is really interesting in me land is like three giant buildings that conect with each others next to the petrobras. The buildings are so extrange in that place because all the houses near just have one floor.
Well I don't know what the project is so I don't know if is going to be difficult or easy, I hope is a middle term. What we have done so far is investigate the land, do some drawing sheets and a model in 1:200. What i really wanna do is solve a problem that happend there, like if we have the chance, I think that one of the most relevant problem is the fact that the people in the neighborhood have to run over the street to get to the park, because exist a ´bridget´ but is in so bad condition that the peolple are scare to walk in there. So I would do a better conection between this two.
that's sounds interesting
ResponderEliminarAs a geography student I also have terrains so I understand what you are saying because here in Santiago there is a lot of segregation and distribution problems.
ResponderEliminarAs a classmate I have to say that the start of this project is so bored, and I hope that it ends fast.
ResponderEliminarnow i'm wondering too, What's proyect going to be about? o:
ResponderEliminarIt is good to have so many time to develop a proyect. lol uwu
ResponderEliminar